I’ve decided that the life of things in a house is around ten years. Things apparently wear out after that length of time or at least the high use things do. Given my hatred of decorating in now comes to the point in the house when I need to make some decisions and get myself prepared to reboot the rooms. I recently noticed that my kitchen sink was dripping water into the void underneath and I found it was the tap causing the issues. The tap was also rusted to the sink quite completely. This necessitated a new sink and tap which I was OK with. I found a sink that was the same size so that hopefully removed the necessity to cut the counter top and with luck the waste pipes would line up well to avoid plumbing issues.
The old sink also had a fresh water tap that I had removed and so it was possibly time to rejig it anyway. All the limescale is me just not having cleaned the sink for a while but there is a lot around the tap and it leaked into the basin but also through into the pipe system. The limescale in this area of the country is pretty harsh and things die after a short time. A friend bought one of those clear kettles to see the water boiling but every week it would need descaling, it’s best not to be able to see these things.
This level of piping is quite frustrating I think. Most of it isn’t used anymore. I used to have a water softener but after a while I noticed that it wasn’t plumbed in correctly so I removed it. There are also spare pipes for cold water access to the bathroom as the hot water pipes to the bathroom were replaced a few years ago. I kind of know what all the pipes do and the ones that aren’t needed are clearly shut off. Oh, and two stop-cocks because apparently you need one before the water meter.
The new sink fitted snugly and that pleased me. There would be less hassle and no cutting of the counter top. The waste pipe could be aligned with a tiny amount of force so officially I have a pre-stressed pipe system, but that stress is low. I did have to cut some of the support wood to get the sink screwed in properly but I’ve been gluing that back and have a plan to secure it more. The new sink feels smaller but I don’t have a huge amount of washing up to do.
Overall this all went well and I will have to start planning the next thing in the house which needs sorting. There’s also the loft and I’ll have to tidy and sort that at some point.